Onshore wind · Germany

Gau-Bickelheim Repowering Phase 1

Operator RheinhessenWind 1 GmbH & Co. KG

Operational11.1 MWData checked 10 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Gau-Bickelheim Repowering Phase 1 is a 11.1 MW wind farm 8.4 km south-west of Wörrstadt, Flonheim, Alzey-Worms, Rheinland-Pfalz, Germany. It first operated in 2023. Its status in the Marktstammdatenregister (Bundesnetzagentur, Germany) is operational. There are 58 other energy sites within 10 km, 50 of them wind farms. The register holds no incident at this site. It holds 30 incidents at wind farms in Germany, and 351 worldwide.

The operator's 1 other site and 418 energy sites within 40 km for Gau-Bickelheim Repowering Phase 1

Members see the sites and incidents around this one, and every record behind them.

Technology
Onshore wind
Capacity
11.1 MW (this record)
All phases
16.7 MW, the phases on the register added up
Capacity figure from
Marktstammdatenregister (Bundesnetzagentur, Germany)
Status
Operational (In operation)
Operator
RheinhessenWind 1 GmbH & Co. KG
Location
Flonheim, Alzey-Worms, Rheinland-Pfalz, 55237, Germany
First operating
2023
Turbines
2

This record is 11.1 MW, one part of a site built in phases. With Gau-Bickelheim Repowering Phase 1 (5.6 MW) the phases on the register add up to 16.7 MW. Gau-Bickelheim Repowering Phase 1

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

  • 20 November 2023 Operational

None found. The register holds no published incident that names Gau-Bickelheim Repowering Phase 1. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Gau-Bickelheim Repowering Phase 1 had a fire or other incident?
None is on the register as of 11 November 2026. The register holds no published incident that names Gau-Bickelheim Repowering Phase 1; it holds 30 incidents at wind farms in Germany.
What is the status of Gau-Bickelheim Repowering Phase 1?
Operational, in the Marktstammdatenregister (Bundesnetzagentur, Germany).
Where is Gau-Bickelheim Repowering Phase 1?
8.4 km south-west of Wörrstadt, Flonheim, Alzey-Worms, Rheinland-Pfalz, Germany (postcode 55237).

Source: Marktstammdatenregister, Bundesnetzagentur, Datenlizenz Deutschland, Namensnennung, Version 2.0 (www.govdata.de/dl-de/by-2-0). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).