Solar · United Kingdom

Gas Governor Station Solar System

Operator Northern Gas Networks Limited

Awaiting Construction0.3 MWData checked 16 November 2026Source record dated 11 January 2022

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Gas Governor Station Solar System is a 0.3 MW solar farm on the edge of Blaydon-on-Tyne, Tyne And Wear, United Kingdom. Its planning application (DC/20/01022/FUL) went to Gateshead on 4 November 2020 and was granted on 1 April 2022. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 56 other energy sites within 10 km, 41 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Gas Governor Station Solar System sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1499, Solar panels linked to fires at council buildings in Northumberland, 18 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-14992025Solar panels linked to fires at council buildings in Northumberland18 kmSignificant
EIR-27212025Solar panel fire breaks out at Shanklea Primary School18 kmSignificant
EIR-15022025Storm Eowyn damages solar panels at Newton Aycliffe Leisure Centre37 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.3 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Northern Gas Networks Limited
Location
Gas Governor Station, Tyne And Wear, NE21 6LE, United Kingdom
Planning authority
Gateshead
Planning application
DC/20/01022/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for DC/20/01022/FUL, with what the planning evidence pack adds for this site.

Every application in Gateshead · Alerts for applications and incidents near here

  • 4 November 2020 Planning application submitted
  • 1 April 2022 Planning permission granted
  • 1 April 2025 Planning permission expired

None found. The register holds no published incident that names Gas Governor Station Solar System. If you know of one, report it (confidential reports are anonymised).

Has Gas Governor Station Solar System had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Gas Governor Station Solar System; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Gas Governor Station Solar System?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 11 January 2022.
Where is Gas Governor Station Solar System?
On the edge of Blaydon-on-Tyne, Tyne And Wear, United Kingdom (postcode NE21 6LE).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).