Battery storage · United Kingdom

Land at Derwenthaugh Eco Park

Operator Derwenthaugh

Planning Permission Expired29 MWData checked 16 November 2026Source record dated 27 May 2020

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Land at Derwenthaugh Eco Park is a 29 MW battery storage site on the edge of Blaydon-on-Tyne, Tyne and Wear, United Kingdom. Its planning application (DC/18/00243/FUL) went to Gateshead on 14 March 2018 and was granted on 23 November 2018. Its status in the Renewable Energy Planning Database (UK government) is planning permission expired. There are 89 other energy sites within 10 km, 15 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

396 energy sites within 40 km for Land at Derwenthaugh Eco Park

Members see the sites and incidents around this one, and every record behind them.

Technology
Battery storage (Stand-alone Storage)
Capacity
29 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Planning Permission Expired
Operator or applicant
Derwenthaugh
Location
Derwenthaugh Eco Park, Derwenthaugh Road, Blaydon, Derwenthaugh Indl Estate, Newcastle-Upon-Tyne, Tyne & Wear, Tyne and Wear, NE16 3BJ, United Kingdom
Planning authority
Gateshead
Planning application
DC/18/00243/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for DC/18/00243/FUL, with what the planning evidence pack adds for this site.

Every application in Gateshead · Alerts for applications and incidents near here

  • 14 March 2018 Planning application submitted
  • 23 November 2018 Planning permission granted
  • 30 May 2021 Planning permission expired

None found. The register holds no published incident that names Land at Derwenthaugh Eco Park. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Land at Derwenthaugh Eco Park had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Land at Derwenthaugh Eco Park; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Land at Derwenthaugh Eco Park?
Planning Permission Expired, in the Renewable Energy Planning Database (UK government), where it last changed on 27 May 2020.
Where is Land at Derwenthaugh Eco Park?
On the edge of Blaydon-on-Tyne, Tyne and Wear, United Kingdom (postcode NE16 3BJ).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).