Battery storage · United Kingdom

Newburn Bridge Road - Battery Storage Facility

Operator The Renewables Infrastructure Group Limited · Owner Capella BESS LTD

Awaiting Construction100 MWData checked 16 November 2026Source record dated 8 October 2024

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Newburn Bridge Road - Battery Storage Facility is a 100 MW battery storage site in Newburn, Tyne And Wear, United Kingdom. Its planning application (DC/21/00922/FUL) went to Gateshead on 16 August 2021 and was granted on 31 March 2022. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 64 other energy sites within 10 km, 12 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Newburn Bridge Road - Battery Storage Facility sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0638, Explosion and prolonged fire at Orsted battery storage site in Liverpool, 192 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool192 kmMajor
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells210 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire363 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Capacity
100 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
The Renewables Infrastructure Group Limited
Owner
Capella BESS LTD
Location
Newburn Bridge Road, Btw Flogas & Blaydon Caravan, Blaydon on Tyne, Tyne And Wear, NE21 4NT, United Kingdom
Planning authority
Gateshead
Planning application
DC/21/00922/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for DC/21/00922/FUL, with what the planning evidence pack adds for this site.

Every application in Gateshead · Alerts for applications and incidents near here

  • 16 August 2021 Planning application submitted
  • 31 March 2022 Planning permission granted
  • 31 March 2025 Planning permission expired

None found. The register holds no published incident that names Newburn Bridge Road - Battery Storage Facility. If you know of one, report it (confidential reports are anonymised).

Has Newburn Bridge Road - Battery Storage Facility had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Newburn Bridge Road - Battery Storage Facility; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Newburn Bridge Road - Battery Storage Facility?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 8 October 2024.
Where is Newburn Bridge Road - Battery Storage Facility?
In Newburn, Tyne And Wear, United Kingdom (postcode NE21 4NT).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).