Battery storage · United Kingdom
Newburn Bridge Road - Battery Storage Facility
Operator The Renewables Infrastructure Group Limited · Owner Capella BESS LTD
Awaiting Construction100 MWData checked 16 November 2026Source record dated 8 October 2024
Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.
Newburn Bridge Road - Battery Storage Facility is a 100 MW battery storage site in Newburn, Tyne And Wear, United Kingdom. Its planning application (DC/21/00922/FUL) went to Gateshead on 16 August 2021 and was granted on 31 March 2022. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 64 other energy sites within 10 km, 12 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.
Get an email when Newburn Bridge Road - Battery Storage Facility changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, battery storage incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every battery storage incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Newburn Bridge Road - Battery Storage Facility sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0638, Explosion and prolonged fire at Orsted battery storage site in Liverpool, 192 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-0638 | 2020 | Explosion and prolonged fire at Orsted battery storage site in Liverpool | 192 km | Major |
| EIR-0584 | 2026 | Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells | 210 km | Significant |
| EIR-0058 | 2025 | Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire | 363 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Battery storage (Stand-alone Storage)
- Capacity
- 100 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- The Renewables Infrastructure Group Limited
- Owner
- Capella BESS LTD
- Location
- Newburn Bridge Road, Btw Flogas & Blaydon Caravan, Blaydon on Tyne, Tyne And Wear, NE21 4NT, United Kingdom
- Planning authority
- Gateshead
- Planning application
- DC/21/00922/FUL
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for DC/21/00922/FUL, with what the planning evidence pack adds for this site.
Every application in Gateshead · Alerts for applications and incidents near here
Timeline
- 16 August 2021 Planning application submitted
- 31 March 2022 Planning permission granted
- 31 March 2025 Planning permission expired
Incidents on the register at this site
None found. The register holds no published incident that names Newburn Bridge Road - Battery Storage Facility. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Newburn Bridge Road - Battery Storage Facility had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Newburn Bridge Road - Battery Storage Facility; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Newburn Bridge Road - Battery Storage Facility?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 8 October 2024.
- Where is Newburn Bridge Road - Battery Storage Facility?
- In Newburn, Tyne And Wear, United Kingdom (postcode NE21 4NT).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).