Solar · United Kingdom

Garson Farm, Winterdown Road - Solar Panels & Battery Storage

Operator Thompson Brothers Esher Limited

Application Submitted0.8 MWData checked 16 November 2026Source record dated 19 May 2023

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Garson Farm, Winterdown Road - Solar Panels & Battery Storage is a 0.8 MW solar farm in Esher, Surrey, United Kingdom. Its planning application (2023/0385) went to Elmbridge on 2 May 2023. Its status in the Renewable Energy Planning Database (UK government) is application submitted. There are 45 other energy sites within 10 km, 29 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Garson Farm, Winterdown Road - Solar Panels & Battery Storage sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0109, Fire in single battery unit at Thurrock BESS under construction, 57 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-01092025Fire in single battery unit at Thurrock BESS under construction57 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire114 kmSignificant
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells202 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.8 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Submitted (Planning Application Submitted)
Operator or applicant
Thompson Brothers Esher Limited
Location
Garson Farm, Winterdown Road, Surrey, KT10 8LS, United Kingdom
Planning authority
Elmbridge
Planning application
2023/0385

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 2023/0385, with what the planning evidence pack adds for this site.

Every application in Elmbridge · Alerts for applications and incidents near here

  • 2 May 2023 Planning application submitted

None found. The register holds no published incident that names Garson Farm, Winterdown Road - Solar Panels & Battery Storage. If you know of one, report it (confidential reports are anonymised).

Has Garson Farm, Winterdown Road - Solar Panels & Battery Storage had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Garson Farm, Winterdown Road - Solar Panels & Battery Storage; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Garson Farm, Winterdown Road - Solar Panels & Battery Storage?
Application Submitted, in the Renewable Energy Planning Database (UK government), where it last changed on 19 May 2023.
Where is Garson Farm, Winterdown Road - Solar Panels & Battery Storage?
In Esher, Surrey, United Kingdom (postcode KT10 8LS).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).