Frodsham Marsh

Operator Foresight/Belltown

Operational50.4 MWData checked 16 November 2026Source record dated 1 May 2018

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Frodsham Marsh is a 50.4 MW wind farm on the edge of Frodsham, Cheshire, United Kingdom. Its planning application went to Cheshire West and Chester on 25 February 2010 and was granted on 19 October 2012. It has been operating since 15 November 2016. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 56 other energy sites within 10 km, one of them a wind farm. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

633 energy sites within 40 km for Frodsham Marsh

Members see the sites and incidents around this one, and every record behind them.

Technology
Onshore wind
Capacity
50.4 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Foresight/Belltown
Location
Land between Manchester Ship Canal and M56, Cheshire, United Kingdom
Planning authority
Cheshire West and Chester
First operating
2016
Turbines
19

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page, with what the planning evidence pack adds for this site.

Every application in Cheshire West and Chester · Alerts for applications and incidents near here

  • 25 February 2010 Planning application submitted
  • 19 October 2012 Planning permission granted
  • 6 August 2015 Construction started
  • 15 November 2016 Operational

None found. The register holds no published incident that names Frodsham Marsh. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Frodsham Marsh had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Frodsham Marsh; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Frodsham Marsh?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 1 May 2018.
Where is Frodsham Marsh?
On the edge of Frodsham, Cheshire, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).