← Back to Cheshire

Battery storage · United Kingdom

Land Off Ash Road Battery Storage (Ash Road, Elton - Battery Energy Storage)

Operator Beryl Street Generation Limited · Owner UK Dynamic Reserve Limited

Application Withdrawn20 MWData checked 16 November 2026Source record dated 26 June 2026

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Land Off Ash Road Battery Storage (Ash Road, Elton - Battery Energy Storage) is a 20 MW battery storage site on the edge of Helsby, Cheshire, United Kingdom. Its planning application (23/03900/FUL) went to Cheshire West and Chester on 8 December 2023 and was withdrawn on 23 April 2026. Its status in the Renewable Energy Planning Database (UK government) is application withdrawn. There are 58 other energy sites within 10 km, 21 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

The operator's 2 other sites and 592 energy sites within 40 km for Land Off Ash Road Battery Storage (Ash Road, Elton…

Members see the sites and incidents around this one, and every record behind them.

BERYL STREET GENERATION LIMITED (SC573847), active, since 2017. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Battery storage (Stand-alone Storage)
Capacity
20 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Withdrawn (Planning Application Withdrawn)
Operator or applicant
Beryl Street Generation Limited
Owner
UK Dynamic Reserve Limited
Location
Ash Road, Elton, Chester, Cheshire, CH2 4RX, United Kingdom
Planning authority
Cheshire West and Chester
Planning application
23/03900/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 23/03900/FUL, with what the planning evidence pack adds for this site.

Every application in Cheshire West and Chester · Alerts for applications and incidents near here

  • 8 December 2023 Planning application submitted
  • 23 April 2026 Application withdrawn

None found. The register holds no published incident that names Land Off Ash Road Battery Storage (Ash Road, Elton - Battery Energy Storage). If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Land Off Ash Road Battery Storage (Ash Road, Elton - Battery Energy Storage) had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Land Off Ash Road Battery Storage (Ash Road, Elton - Battery Energy Storage); it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Land Off Ash Road Battery Storage (Ash Road, Elton - Battery Energy Storage)?
Application Withdrawn, in the Renewable Energy Planning Database (UK government), where it last changed on 26 June 2026.
Where is Land Off Ash Road Battery Storage (Ash Road, Elton - Battery Energy Storage)?
On the edge of Helsby, Cheshire, United Kingdom (postcode CH2 4RX).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).