Onshore wind · United Kingdom
French Farm
Operator REG Windpower (previously Cornwall Light and Power)
Operational4 MWData checked 16 November 2026Source record dated 16 December 2016
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
French Farm is a 4 MW wind farm 11 km north of Primrose Place, Cambridgeshire, United Kingdom. Its planning application (08/01365/FUL) went to Peterborough on 6 November 2008 and was granted on appeal on 10 September 2010. It has been operating since 24 November 2016. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 23 other energy sites within 10 km, 8 of them wind farms. The register holds one incident at this site, the latest in 2022.
Incidents on the register at this site
A Siemens Gamesa G80-2.0 wind turbine at the French Farm project in Cambridgeshire caught fire on the evening of 24 April 2022. The nacelle and blades were affected. Lincolnshire Fire and Rescue Service initially attended, followed by Cambridgeshire Fire and...
Matched by the site's name in the entry's own reporting. If one is wrong, tell the editor.
Get an email when French Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Onshore wind
- Capacity
- 4 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- REG Windpower (previously Cornwall Light and Power)
- Location
- French Farm, French Drove, Thorney, Peterborough, Cambridgeshire, United Kingdom
- Planning authority
- Peterborough
- Planning application
- 08/01365/FUL
- Appeal reference
- APP/J5400/A/09/2116682
- First operating
- 2016
- Turbines
- 2
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 08/01365/FUL, with what the planning evidence pack adds for this site.
Every application in Peterborough · Alerts for applications and incidents near here
Timeline
- 6 November 2008 Planning application submitted
- 10 July 2009 Planning permission refused
- 10 September 2010 Planning permission granted
- 10 September 2010 Appeal granted
- 26 May 2016 Construction started
- 24 November 2016 Operational
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has French Farm had a fire or other incident?
- Yes. The register holds one incident that names it: Fire damages Siemens Gamesa turbine at French Farm wind farm (EIR-1275, 2022).
- What is the status of French Farm?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 16 December 2016.
- Where is French Farm?
- 11 km north of Primrose Place, Cambridgeshire, United Kingdom.
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).