Forest Farm

Operator NESF (formerly Earthworm/Waltham Solar)

Operational3 MWData checked 16 November 2026Source record dated 3 May 2017

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Forest Farm is a 3 MW solar farm on the edge of Bishops Waltham, Hampshire, United Kingdom. Its planning application (15/00082/FUL) went to Winchester on 4 February 2015 and was granted on 11 December 2015. It has been operating since 1 March 2017. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 41 other energy sites within 10 km, 27 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

347 energy sites within 40 km for Forest Farm

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
3 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
NESF (formerly Earthworm/Waltham Solar)
Location
Forest Farm, Winchester Road, Waltham Chase, Southampton, Hampshire, SO32 2LL, United Kingdom
Planning authority
Winchester
Planning application
15/00082/FUL
First operating
2017

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 15/00082/FUL, with what the planning evidence pack adds for this site.

Every application in Winchester · Alerts for applications and incidents near here

  • 4 February 2015 Planning application submitted
  • 11 December 2015 Planning permission granted
  • 1 February 2017 Construction started
  • 1 March 2017 Operational

None found. The register holds no published incident that names Forest Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Forest Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Forest Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Forest Farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 3 May 2017.
Where is Forest Farm?
On the edge of Bishops Waltham, Hampshire, United Kingdom (postcode SO32 2LL).