Solar · United Kingdom
New Farm House Locks Farm
Operator Nextpower Spv 12 Limited
Awaiting Construction18 MWData checked 16 November 2026Source record dated 11 October 2024
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
New Farm House Locks Farm is a 18 MW solar farm on the edge of Bishops Waltham, Hampshire, United Kingdom. Its planning application (21/01391/FUL) went to Winchester on 8 June 2021 and was granted on 9 June 2023. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 47 other energy sites within 10 km, 32 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when New Farm House Locks Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for New Farm House Locks Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1534, Storm Eunice loosens solar panels on Eastleigh flats, 9.8 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1534 | 2022 | Storm Eunice loosens solar panels on Eastleigh flats | 9.8 km | Minor |
| EIR-1529 | 2023 | Fire contained to solar panels on Gosport flats roof | 18 km | Minor |
| EIR-2076 | 2020 | Fire across four homes in Leigh Park most likely linked to solar panel equipment, fire service says | 18 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 18 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Nextpower Spv 12 Limited
- Location
- New Farm House, Locks Farm, Botley Road, Bishops Waltham, Southampton, Hampshire, Hampshire, SO32 1DR, United Kingdom
- Planning authority
- Winchester
- Planning application
- 21/01391/FUL
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 21/01391/FUL, with what the planning evidence pack adds for this site.
Every application in Winchester · Alerts for applications and incidents near here
Timeline
- 8 June 2021 Planning application submitted
- 9 June 2023 Planning permission granted
- 9 June 2026 Planning permission expired
Incidents on the register at this site
None found. The register holds no published incident that names New Farm House Locks Farm. If you know of one, report it (confidential reports are anonymised).
Questions
- Has New Farm House Locks Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names New Farm House Locks Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of New Farm House Locks Farm?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 11 October 2024.
- Where is New Farm House Locks Farm?
- On the edge of Bishops Waltham, Hampshire, United Kingdom (postcode SO32 1DR).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).