← Back to Texas
Planning pack for this site, £295Other options

Solar · United States

Flatland Solar

Operator Flatland Solar Energy, LLC

Planned180 MWData checked 12 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Flatland Solar is a 180 MW solar farm 12 km south-west of Snyder, Scurry County, Texas, United States. Its status in the U.S. Energy Information Administration, Form EIA-860M is planned. There is one other energy site within 10 km. The register holds no incident at this site. It holds 168 incidents at solar farms (hybrid battery and solar sites included) in the United States, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Flatland Solar sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 168 comparable solar incidents in the United States, nearest first. The nearest is EIR-1366, Solar panels catch fire at a cinema in south Austin, 216 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-13662023Solar panels catch fire at a cinema in south Austin216 kmMinor
EIR-14752026Solar panel fire displaces residents at Amarillo apartment complex299 kmMinor
EIR-05502026Grass fire burns over 30 acres at solar farm complex near Hillsboro, Texas368 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 165 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
180 MW
Capacity figure from
U.S. Energy Information Administration, Form EIA-860M
Status
Planned
Operator
Flatland Solar Energy, LLC
Owner
Flatland Solar Energy, LLC
Location
Scurry County, Texas, United States
Expected
2027
Balancing authority
ERCO

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names Flatland Solar. If you know of one, report it (confidential reports are anonymised).

Has Flatland Solar had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Flatland Solar; it holds 168 incidents at solar farms (hybrid battery and solar sites included) in the United States.
What is the status of Flatland Solar?
Planned, in the U.S. Energy Information Administration, Form EIA-860M.
Where is Flatland Solar?
12 km south-west of Snyder, Scurry County, Texas, United States.

Source: U.S. Energy Information Administration, Form EIA-860M (Preliminary Monthly Electric Generator Inventory). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).