← Back to Texas
Planning pack for this site, £295Other options

Battery storage · United States

Dolce BESS, LLC

Operator Samsung C&T Renewables, LLC

Planned101 MWData checked 12 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Dolce BESS, LLC is a 101 MW battery storage site 26 km south of Snyder, Mitchell County, Texas, United States. Its status in the U.S. Energy Information Administration, Form EIA-860M is planned. No other energy site in the register's datasets is within 10 km. The register holds no incident at this site. It holds 61 incidents at battery storage sites (hybrid battery and solar sites included) in the United States, and 199 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Dolce BESS, LLC sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 55 comparable battery incidents in the United States, grid-scale only, nearest first. The nearest is EIR-1652, Small fire contained at Terra-Gen battery storage in Valley Center, 676 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-16522026Small fire contained at Terra-Gen battery storage in Valley Center676 kmMinor
EIR-12272026Firefighters respond to a battery storage fire in Mission, Texas740 kmSignificant
EIR-28292022Lithium battery fire smoulders at Chandler storage facility, Arizona1025 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 52 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage
Capacity
101 MW
Capacity figure from
U.S. Energy Information Administration, Form EIA-860M
Status
Planned
Operator
Samsung C&T Renewables, LLC
Owner
Samsung C&T Renewables, LLC
Location
Mitchell County, Texas, United States
Expected
2028
Balancing authority
ERCO

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names Dolce BESS, LLC. If you know of one, report it (confidential reports are anonymised).

Has Dolce BESS, LLC had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Dolce BESS, LLC; it holds 61 incidents at battery storage sites (hybrid battery and solar sites included) in the United States.
What is the status of Dolce BESS, LLC?
Planned, in the U.S. Energy Information Administration, Form EIA-860M.
Where is Dolce BESS, LLC?
26 km south of Snyder, Mitchell County, Texas, United States.

Source: U.S. Energy Information Administration, Form EIA-860M (Preliminary Monthly Electric Generator Inventory). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).