Solar · United States
Five Wells Solar Center - Hybrid
Operator Five Wells Solar Center, LLC
Operational355 MWData checked 12 November 2026
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Five Wells Solar Center - Hybrid is a 355 MW solar farm 14 km south-east of Temple, Bell County, Texas, United States. It first operated in 2023. Its status in the U.S. Energy Information Administration, Form EIA-860M is operational. There are 10 other energy sites within 10 km, 2 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 168 incidents at solar farms (hybrid battery and solar sites included) in the United States, and 480 worldwide.
Get an email when Five Wells Solar Center - Hybrid changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United States. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Solar
- Capacity
- 355 MW
- Capacity figure from
- U.S. Energy Information Administration, Form EIA-860M
- Status
- Operational
- Operator
- Five Wells Solar Center, LLC
- Owner
- Five Wells Solar Center, LLC
- Location
- Bell County, Texas, United States
- First operating
- 2023
- Balancing authority
- ERCO
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
Incidents on the register at this site
None found. The register holds no published incident that names Five Wells Solar Center - Hybrid. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Five Wells Solar Center - Hybrid had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Five Wells Solar Center - Hybrid; it holds 168 incidents at solar farms (hybrid battery and solar sites included) in the United States.
- What is the status of Five Wells Solar Center - Hybrid?
- Operational, in the U.S. Energy Information Administration, Form EIA-860M.
- Where is Five Wells Solar Center - Hybrid?
- 14 km south-east of Temple, Bell County, Texas, United States.
Source: U.S. Energy Information Administration, Form EIA-860M (Preliminary Monthly Electric Generator Inventory). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).