← Back to Texas

Battery storage · United States

Five Wells Solar Center - Hybrid

Operator Five Wells Solar Center, LLC

Operational263 MWData checked 12 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Five Wells Solar Center - Hybrid is a 263 MW battery storage site 14 km south-east of Temple, Bell County, Texas, United States. It first operated in 2024. Its status in the U.S. Energy Information Administration, Form EIA-860M is operational. There are 10 other energy sites within 10 km, one of them a battery storage site. The register holds no incident at this site. It holds 61 incidents at battery storage sites (hybrid battery and solar sites included) in the United States, and 199 worldwide.

The operator's 1 other site and 32 energy sites within 40 km for Five Wells Solar Center - Hybrid

Members see the sites and incidents around this one, and every record behind them.

Technology
Battery storage (250 MWh)
Capacity
263 MW
Capacity figure from
U.S. Energy Information Administration, Form EIA-860M
Status
Operational
Operator
Five Wells Solar Center, LLC
Owner
Five Wells Solar Center, LLC
Location
Bell County, Texas, United States
First operating
2024
Balancing authority
ERCO

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names Five Wells Solar Center - Hybrid. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Five Wells Solar Center - Hybrid had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Five Wells Solar Center - Hybrid; it holds 61 incidents at battery storage sites (hybrid battery and solar sites included) in the United States.
What is the status of Five Wells Solar Center - Hybrid?
Operational, in the U.S. Energy Information Administration, Form EIA-860M.
Where is Five Wells Solar Center - Hybrid?
14 km south-east of Temple, Bell County, Texas, United States.

Source: U.S. Energy Information Administration, Form EIA-860M (Preliminary Monthly Electric Generator Inventory). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).