Onshore wind · United States
Firelands Wind
Operator Firelands Wind, LLC
Under construction297 MWData checked 12 November 2026
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Firelands Wind is a 297 MW wind farm 8.8 km south-east of Bellevue, Huron County, Ohio, United States. Its status in the U.S. Energy Information Administration, Form EIA-860M is under construction. There is one other energy site within 10 km. The register holds no incident at this site. It holds 107 incidents at wind farms in the United States, and 362 worldwide.
Get an email when Firelands Wind changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United States. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Firelands Wind sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 105 comparable onshore wind incidents in the United States, nearest first. The nearest is EIR-0805, Vestas blade fails at Timber Road IV wind farm in Ohio, 110 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-0805 | 2020 | Vestas blade fails at Timber Road IV wind farm in Ohio | 110 km | Significant |
| EIR-1747 | 2024 | One Energy turbine blade falls in Allen Township Ohio | 188 km | Significant |
| EIR-1128 | 2017 | Wind turbine blade breaks and dangles at Michigan wind farm | 260 km | Minor |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 102 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Onshore wind
- Capacity
- 297 MW
- Capacity figure from
- U.S. Energy Information Administration, Form EIA-860M
- Status
- Under construction
- Operator
- Firelands Wind, LLC
- Owner
- Firelands Wind, LLC
- Location
- Huron County, Ohio, United States
- Expected
- 2027
- Balancing authority
- PJM
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
Incidents on the register at this site
None found. The register holds no published incident that names Firelands Wind. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Firelands Wind had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Firelands Wind; it holds 107 incidents at wind farms in the United States.
- What is the status of Firelands Wind?
- Under construction, in the U.S. Energy Information Administration, Form EIA-860M.
- Where is Firelands Wind?
- 8.8 km south-east of Bellevue, Huron County, Ohio, United States.
Source: U.S. Energy Information Administration, Form EIA-860M (Preliminary Monthly Electric Generator Inventory). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).