Solar · United Kingdom

Feed Millakin - Solar Panels

Operator Mowi Scotland Limited

Awaiting Construction0.3 MWData checked 16 November 2026Source record dated 18 July 2023

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Feed Millakin - Solar Panels is a 0.3 MW solar farm Highland, United Kingdom. Its planning application (23/02112/FUL) went to Highland on 10 May 2023 and was granted on 18 July 2023. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. No other energy site in the register's datasets is within 10 km. The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Feed Millakin - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1238, Leak from solar heating system at Carnegie Leisure Centre Dunfermline, 193 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-12382019Leak from solar heating system at Carnegie Leisure Centre Dunfermline193 kmMinor
EIR-14762026House fire reported to have started on solar panels in Carnoustie203 kmSignificant
EIR-20162022Solar panel fire evacuates Hawick High School275 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.3 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Mowi Scotland Limited
Location
Mowi Scotland Limited, Feed Millakin, Kyle, Highland, IV41 8PQ, United Kingdom
Planning authority
Highland
Planning application
23/02112/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 23/02112/FUL, with what the planning evidence pack adds for this site.

Every application in Highland · Alerts for applications and incidents near here

  • 10 May 2023 Planning application submitted
  • 18 July 2023 Planning permission granted
  • 18 July 2026 Planning permission expired

None found. The register holds no published incident that names Feed Millakin - Solar Panels. If you know of one, report it (confidential reports are anonymised).

Has Feed Millakin - Solar Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Feed Millakin - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Feed Millakin - Solar Panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 18 July 2023.
Where is Feed Millakin - Solar Panels?
Highland, United Kingdom (postcode IV41 8PQ).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.