Solar · United Kingdom
Eyemouth Freezers, Toll Bridge Road - Solar Panels
Operator Eyemouth Freezers Limited
Awaiting Construction1.2 MWData checked 16 November 2026Source record dated 13 May 2024
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Eyemouth Freezers, Toll Bridge Road - Solar Panels is a 1.2 MW solar farm 13 km north-west of Berwick-Upon-Tweed, Borders, United Kingdom. Its planning application (24/00208/FUL) went to Scottish Borders on 26 February 2024 and was granted on 4 April 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 4 other energy sites within 10 km, one of them a solar farm. The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Eyemouth Freezers, Toll Bridge Road - Solar Panels changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Eyemouth Freezers, Toll Bridge Road - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-2016, Solar panel fire evacuates Hawick High School, 66 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-2016 | 2022 | Solar panel fire evacuates Hawick High School | 66 km | Significant |
| EIR-1476 | 2026 | House fire reported to have started on solar panels in Carnoustie | 80 km | Significant |
| EIR-1238 | 2019 | Leak from solar heating system at Carnegie Leisure Centre Dunfermline | 88 km | Minor |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 1.2 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Eyemouth Freezers Limited
- Location
- Eyemouth Freezers Ltd Toll Bridge Road, Borders, TD14 5GN, United Kingdom
- Planning authority
- Scottish Borders
- Planning application
- 24/00208/FUL
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 24/00208/FUL, with what the planning evidence pack adds for this site.
Every application in Scottish Borders · Alerts for applications and incidents near here
Timeline
- 26 February 2024 Planning application submitted
- 4 April 2024 Planning permission granted
Incidents on the register at this site
None found. The register holds no published incident that names Eyemouth Freezers, Toll Bridge Road - Solar Panels. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Eyemouth Freezers, Toll Bridge Road - Solar Panels had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Eyemouth Freezers, Toll Bridge Road - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Eyemouth Freezers, Toll Bridge Road - Solar Panels?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 13 May 2024.
- Where is Eyemouth Freezers, Toll Bridge Road - Solar Panels?
- 13 km north-west of Berwick-Upon-Tweed, Borders, United Kingdom (postcode TD14 5GN).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).