← Back to Ayrshire
Planning pack for this site, £295Other options

Battery storage · United Kingdom

Electricity Substation, Bardarroch - Battery Energy Storage

Operator Balance Power Projects Limited

Awaiting Construction29.9 MWData checked 16 November 2026Source record dated 6 May 2025

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Electricity Substation, Bardarroch - Battery Energy Storage is a 29.9 MW battery storage site 10 km west of Cumnock, Ayrshire, United Kingdom. Its planning application (23/0604/PP) went to East Ayrshire on 28 November 2023 and was granted on 4 March 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 17 other energy sites within 10 km, 5 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Electricity Substation, Bardarroch - Battery Energy Storage sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0638, Explosion and prolonged fire at Orsted battery storage site in Liverpool, 248 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool248 kmMajor
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells336 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire446 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Capacity
29.9 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Balance Power Projects Limited
Location
S/O Electricity Substation, A70 From B730 To U74 Bardarroch, Ochiltree, Cumnock, Ayrshire, KA18 2RL, United Kingdom
Planning authority
East Ayrshire
Planning application
23/0604/PP

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 23/0604/PP, with what the planning evidence pack adds for this site.

Every application in East Ayrshire · Alerts for applications and incidents near here

  • 28 November 2023 Planning application submitted
  • 4 March 2025 Planning permission granted

None found. The register holds no published incident that names Electricity Substation, Bardarroch - Battery Energy Storage. If you know of one, report it (confidential reports are anonymised).

Has Electricity Substation, Bardarroch - Battery Energy Storage had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Electricity Substation, Bardarroch - Battery Energy Storage; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Electricity Substation, Bardarroch - Battery Energy Storage?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 6 May 2025.
Where is Electricity Substation, Bardarroch - Battery Energy Storage?
10 km west of Cumnock, Ayrshire, United Kingdom (postcode KA18 2RL).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).