Solar · United States

Eland Solar & Storage Center, Phase 2 Hy

Operator 69SV 8me LLC · Owner Arevon Asset Management

Operational308 MWData checked 12 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Eland Solar & Storage Center, Phase 2 Hy is a 308 MW solar farm 10 km north of California City, Kern County, California, United States. It first operated in 2025. Its status in the U.S. Energy Information Administration, Form EIA-860M is operational. There are 18 other energy sites within 10 km, 13 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 168 incidents at solar farms (hybrid battery and solar sites included) in the United States, and 480 worldwide.

The operator's 1 other site and 121 energy sites within 40 km for Eland Solar & Storage Center, Phase 2 Hy

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
308 MW (this record)
All phases
618 MW, the phases on the register added up
Capacity figure from
U.S. Energy Information Administration, Form EIA-860M
Status
Operational
Operator
69SV 8me LLC
Owner
Arevon Asset Management
Location
Kern County, California, United States
First operating
2025
Balancing authority
LDWP

This record is 308 MW, one part of a site built in phases. With Eland Solar & Storage Center, Phase 1 Hy (310 MW) the phases on the register add up to 618 MW. Eland Solar & Storage Center, Phase 1 Hy

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names Eland Solar & Storage Center, Phase 2 Hy. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Eland Solar & Storage Center, Phase 2 Hy had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Eland Solar & Storage Center, Phase 2 Hy; it holds 168 incidents at solar farms (hybrid battery and solar sites included) in the United States.
What is the status of Eland Solar & Storage Center, Phase 2 Hy?
Operational, in the U.S. Energy Information Administration, Form EIA-860M.
Where is Eland Solar & Storage Center, Phase 2 Hy?
10 km north of California City, Kern County, California, United States.

Source: U.S. Energy Information Administration, Form EIA-860M (Preliminary Monthly Electric Generator Inventory). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).