Solar · United States
Eland Solar & Storage Center, Phase 2 Hy
Operator 69SV 8me LLC · Owner Arevon Asset Management
Operational308 MWData checked 12 November 2026
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Eland Solar & Storage Center, Phase 2 Hy is a 308 MW solar farm 10 km north of California City, Kern County, California, United States. It first operated in 2025. Its status in the U.S. Energy Information Administration, Form EIA-860M is operational. There are 18 other energy sites within 10 km, 13 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 168 incidents at solar farms (hybrid battery and solar sites included) in the United States, and 480 worldwide.
Get an email when Eland Solar & Storage Center, Phase 2 Hy changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United States. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Solar
- Capacity
- 308 MW (this record)
- All phases
- 618 MW, the phases on the register added up
- Capacity figure from
- U.S. Energy Information Administration, Form EIA-860M
- Status
- Operational
- Operator
- 69SV 8me LLC
- Owner
- Arevon Asset Management
- Location
- Kern County, California, United States
- First operating
- 2025
- Balancing authority
- LDWP
This record is 308 MW, one part of a site built in phases. With Eland Solar & Storage Center, Phase 1 Hy (310 MW) the phases on the register add up to 618 MW. Eland Solar & Storage Center, Phase 1 Hy
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
Incidents on the register at this site
None found. The register holds no published incident that names Eland Solar & Storage Center, Phase 2 Hy. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Eland Solar & Storage Center, Phase 2 Hy had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Eland Solar & Storage Center, Phase 2 Hy; it holds 168 incidents at solar farms (hybrid battery and solar sites included) in the United States.
- What is the status of Eland Solar & Storage Center, Phase 2 Hy?
- Operational, in the U.S. Energy Information Administration, Form EIA-860M.
- Where is Eland Solar & Storage Center, Phase 2 Hy?
- 10 km north of California City, Kern County, California, United States.
Source: U.S. Energy Information Administration, Form EIA-860M (Preliminary Monthly Electric Generator Inventory). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).