← Back to California

Battery storage · United States

Eland Solar & Storage Center, Phase 2 Hy

Operator 69SV 8me LLC · Owner Arevon Asset Management

Operational150 MWData checked 12 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Eland Solar & Storage Center, Phase 2 Hy is a 150 MW battery storage site 10 km north of California City, Kern County, California, United States. It first operated in 2025. Its status in the U.S. Energy Information Administration, Form EIA-860M is operational. There are 18 other energy sites within 10 km, 3 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 61 incidents at battery storage sites (hybrid battery and solar sites included) in the United States, and 199 worldwide.

The operator's 1 other site and 121 energy sites within 40 km for Eland Solar & Storage Center, Phase 2 Hy

Members see the sites and incidents around this one, and every record behind them.

Technology
Battery storage (600 MWh)
Capacity
150 MW (this record)
All phases
300 MW, the phases on the register added up
Capacity figure from
U.S. Energy Information Administration, Form EIA-860M
Status
Operational
Operator
69SV 8me LLC
Owner
Arevon Asset Management
Location
Kern County, California, United States
First operating
2025
Balancing authority
LDWP

This record is 150 MW, one part of a site built in phases. With Eland Solar & Storage Center, Phase 1 Hy (150 MW) the phases on the register add up to 300 MW. Eland Solar & Storage Center, Phase 1 Hy

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names Eland Solar & Storage Center, Phase 2 Hy. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Eland Solar & Storage Center, Phase 2 Hy had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Eland Solar & Storage Center, Phase 2 Hy; it holds 61 incidents at battery storage sites (hybrid battery and solar sites included) in the United States.
What is the status of Eland Solar & Storage Center, Phase 2 Hy?
Operational, in the U.S. Energy Information Administration, Form EIA-860M.
Where is Eland Solar & Storage Center, Phase 2 Hy?
10 km north of California City, Kern County, California, United States.

Source: U.S. Energy Information Administration, Form EIA-860M (Preliminary Monthly Electric Generator Inventory). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).