← Back to Wiltshire
Planning pack for this site, £295Other options

Solar · United Kingdom

Edinburgh Way - Solar Photovolatic Panel

Operator EDF Energy Renewables

Awaiting Construction0.7 MWData checked 16 November 2026Source record dated 4 August 2022

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Edinburgh Way - Solar Photovolatic Panel is a 0.7 MW solar farm in Neston, Wiltshire, United Kingdom. Its planning application (PL/2022/05332) went to Wiltshire on 25 July 2022 and was granted on 15 September 2022. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 53 other energy sites within 10 km, 30 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

EDF ENERGY RENEWABLES LIMITED (06456689), active, since 2007. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Edinburgh Way - Solar Photovolatic Panel sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-2065, Loft fire believed caused by a solar panel at Paintworks flats in Bristol, 26 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-20652021Loft fire believed caused by a solar panel at Paintworks flats in Bristol26 kmMinor
EIR-14162025Fire at Bristol hospital started in solar panels27 kmSignificant
EIR-12742022Fire damages rooftop solar panels at We The Curious in Bristol27 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.7 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
EDF Energy Renewables
Location
Pilgrim, Edinburgh Way, Corsham, Wiltshire, SN13 9XZ, United Kingdom
Planning authority
Wiltshire
Planning application
PL/2022/05332

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for PL/2022/05332, with what the planning evidence pack adds for this site.

Every application in Wiltshire · Alerts for applications and incidents near here

  • 25 July 2022 Planning application submitted
  • 15 September 2022 Planning permission granted
  • 15 September 2025 Planning permission expired

None found. The register holds no published incident that names Edinburgh Way - Solar Photovolatic Panel. If you know of one, report it (confidential reports are anonymised).

Has Edinburgh Way - Solar Photovolatic Panel had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Edinburgh Way - Solar Photovolatic Panel; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Edinburgh Way - Solar Photovolatic Panel?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 4 August 2022.
Where is Edinburgh Way - Solar Photovolatic Panel?
In Neston, Wiltshire, United Kingdom (postcode SN13 9XZ).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).