Operational5 MWData checked 16 November 2026Source record dated 4 December 2017

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Ebnal Lodge is a 5 MW solar farm 5 km north-east of Oswestry, Shropshire, United Kingdom. Its planning application (15/03975/FUL) went to Shropshire on 23 September 2015 and was granted on 23 December 2015. It has been operating since 15 February 2017. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 27 other energy sites within 10 km, 21 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 11 other sites and 197 energy sites within 40 km for Ebnal Lodge

Members see the sites and incidents around this one, and every record behind them.

GREENCOAT CAPITAL MANAGEMENT INVESTMENT LIMITED (13055373), active, since 2020. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Greencoat Capital
Owner
Schroder Administration Limited
Location
Land At, Rhosygadfa, Gobowen, Oswestry, Shropshire, United Kingdom
Planning authority
Shropshire
Planning application
15/03975/FUL
First operating
2017

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 15/03975/FUL, with what the planning evidence pack adds for this site.

Every application in Shropshire · Alerts for applications and incidents near here

  • 23 September 2015 Planning application submitted
  • 23 December 2015 Planning permission granted
  • 12 December 2016 Construction started
  • 15 February 2017 Operational

None found. The register holds no published incident that names Ebnal Lodge. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Ebnal Lodge had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Ebnal Lodge; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Ebnal Lodge?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 4 December 2017.
Where is Ebnal Lodge?
5 km north-east of Oswestry, Shropshire, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).