Solar · United Kingdom
Easter Bush
Operator University of Edinburgh (Estates Department)
Under Construction3 MWData checked 16 November 2026Source record dated 23 September 2020
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Easter Bush is a 3 MW solar farm on the edge of Loanhead, Midlothian, United Kingdom. Its planning application (19/00022/DPP) went to Midlothian on 11 January 2019 and was granted on 22 October 2021. Construction started on 30 June 2020. Its status in the Renewable Energy Planning Database (UK government) is under construction. There are 34 other energy sites within 10 km, 17 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Easter Bush changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Easter Bush sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1238, Leak from solar heating system at Carnegie Leisure Centre Dunfermline, 28 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1238 | 2019 | Leak from solar heating system at Carnegie Leisure Centre Dunfermline | 28 km | Minor |
| EIR-2016 | 2022 | Solar panel fire evacuates Hawick High School | 56 km | Significant |
| EIR-1476 | 2026 | House fire reported to have started on solar panels in Carnoustie | 76 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 3 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Under Construction
- Operator or applicant
- University of Edinburgh (Estates Department)
- Location
- Land 175M NE Of Midlothian Inn, Bush Farm, Roslin, Lothian, Midlothian, EH25, United Kingdom
- Planning authority
- Midlothian
- Planning application
- 19/00022/DPP
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 19/00022/DPP, with what the planning evidence pack adds for this site.
Every application in Midlothian · Alerts for applications and incidents near here
Timeline
- 11 January 2019 Planning application submitted
- 30 June 2020 Construction started
- 22 October 2021 Planning permission granted
Incidents on the register at this site
None found. The register holds no published incident that names Easter Bush. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Easter Bush had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Easter Bush; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Easter Bush?
- Under Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 23 September 2020.
- Where is Easter Bush?
- On the edge of Loanhead, Midlothian, United Kingdom (postcode EH25).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).