← Back to Lothian
Planning pack for this site, £295Other options

Battery storage · United Kingdom

Existing Kaimes Substation, Old Burdiehouse Road - Battery Storage

Operator Kaimes Renewable Energy Park

Application Submitted49.9 MWData checked 16 November 2026Source record dated 9 April 2024

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Existing Kaimes Substation, Old Burdiehouse Road - Battery Storage is a 49.9 MW battery storage site on the edge of Loanhead, Lothian, United Kingdom. Its planning application (24/01489/FUL) went to City of Edinburgh on 26 March 2024. Its status in the Renewable Energy Planning Database (UK government) is application submitted. There are 38 other energy sites within 10 km, 4 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Existing Kaimes Substation, Old Burdiehouse Road - Battery Storage sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0638, Explosion and prolonged fire at Orsted battery storage site in Liverpool, 279 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool279 kmMajor
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells336 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire472 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Capacity
49.9 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Submitted (Planning Application Submitted)
Operator or applicant
Kaimes Renewable Energy Park
Location
West Of Existing Kaimes Substation Old Burdiehouse Road, Lothian, EH17 8BQ, United Kingdom
Planning authority
City of Edinburgh
Planning application
24/01489/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 24/01489/FUL, with what the planning evidence pack adds for this site.

Every application in City of Edinburgh · Alerts for applications and incidents near here

  • 26 March 2024 Planning application submitted

None found. The register holds no published incident that names Existing Kaimes Substation, Old Burdiehouse Road - Battery Storage. If you know of one, report it (confidential reports are anonymised).

Has Existing Kaimes Substation, Old Burdiehouse Road - Battery Storage had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Existing Kaimes Substation, Old Burdiehouse Road - Battery Storage; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Existing Kaimes Substation, Old Burdiehouse Road - Battery Storage?
Application Submitted, in the Renewable Energy Planning Database (UK government), where it last changed on 9 April 2024.
Where is Existing Kaimes Substation, Old Burdiehouse Road - Battery Storage?
On the edge of Loanhead, Lothian, United Kingdom (postcode EH17 8BQ).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).