Solar · United Kingdom
East Lenham Solar Farm
Operator Laurence Associates
Operational6.6 MWData checked 16 November 2026Source record dated 29 September 2015
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
East Lenham Solar Farm is a 6.6 MW solar farm 13 km south of Sittingbourne, Kent, United Kingdom. Its planning application (12/0013) went to Maidstone on 20 January 2012 and was granted on 1 November 2012. It has been operating since 30 March 2014. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 13 other energy sites within 10 km, 12 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when East Lenham Solar Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Solar
- Capacity
- 6.6 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Laurence Associates
- Location
- East Lenham Farm, East Lenham Road, Lenham, Maidstone, Kent, Kent, ME17 2DP, United Kingdom
- Planning authority
- Maidstone
- Planning application
- 12/0013
- First operating
- 2014
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 12/0013, with what the planning evidence pack adds for this site.
Every application in Maidstone · Alerts for applications and incidents near here
Timeline
- 20 January 2012 Planning application submitted
- 1 November 2012 Planning permission granted
- 1 February 2014 Construction started
- 30 March 2014 Operational
Incidents on the register at this site
None found. The register holds no published incident that names East Lenham Solar Farm. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has East Lenham Solar Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names East Lenham Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of East Lenham Solar Farm?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 29 September 2015.
- Where is East Lenham Solar Farm?
- 13 km south of Sittingbourne, Kent, United Kingdom (postcode ME17 2DP).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).