← Back to Kent

Solar · United Kingdom

East Lenham Solar Farm

Operator Laurence Associates

Operational6.6 MWData checked 16 November 2026Source record dated 29 September 2015

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

East Lenham Solar Farm is a 6.6 MW solar farm 13 km south of Sittingbourne, Kent, United Kingdom. Its planning application (12/0013) went to Maidstone on 20 January 2012 and was granted on 1 November 2012. It has been operating since 30 March 2014. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 13 other energy sites within 10 km, 12 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 1 other site and 359 energy sites within 40 km for East Lenham Solar Farm

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
6.6 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Laurence Associates
Location
East Lenham Farm, East Lenham Road, Lenham, Maidstone, Kent, Kent, ME17 2DP, United Kingdom
Planning authority
Maidstone
Planning application
12/0013
First operating
2014

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 12/0013, with what the planning evidence pack adds for this site.

Every application in Maidstone · Alerts for applications and incidents near here

  • 20 January 2012 Planning application submitted
  • 1 November 2012 Planning permission granted
  • 1 February 2014 Construction started
  • 30 March 2014 Operational

None found. The register holds no published incident that names East Lenham Solar Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has East Lenham Solar Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names East Lenham Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of East Lenham Solar Farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 29 September 2015.
Where is East Lenham Solar Farm?
13 km south of Sittingbourne, Kent, United Kingdom (postcode ME17 2DP).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).