Battery storage · United Kingdom

Earthcott Green Farm, Earthcott Green - Battery Energy Storage

Operator Immersa Limited · Owner Earthcott Battery Storage Limited

Awaiting Construction200 MWData checked 16 November 2026Source record dated 19 August 2025

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Earthcott Green Farm, Earthcott Green - Battery Energy Storage is a 200 MW battery storage site 5 km south of Thornbury, Gloucestershire, United Kingdom. Its planning application (P23/01244/F) went to South Gloucestershire on 31 March 2023 and was granted on appeal on 30 July 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 88 other energy sites within 10 km, 27 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

IMMERSA LIMITED (10124672), active, since 2016. 1 outstanding charge on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Earthcott Green Farm, Earthcott Green - Battery Energy Storage sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0058, Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire, 43 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire43 kmSignificant
EIR-02492026Smoke and fire incident at Battery Box, Pinhoe Road, Exeter114 kmSignificant
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells197 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Capacity
200 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Appeal Granted)
Operator or applicant
Immersa Limited
Owner
Earthcott Battery Storage Limited
Location
Earthcott Green Farm, Earthcott Green, Alveston, Bristol, Gloucestershire, BS35 3TD, United Kingdom
Planning authority
South Gloucestershire
Planning application
P23/01244/F
Appeal reference
APP/P0119/W/24/3357847

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for P23/01244/F, with what the planning evidence pack adds for this site.

Every application in South Gloucestershire · Alerts for applications and incidents near here

  • 30 July 2011 Planning permission expired
  • 31 March 2023 Planning application submitted
  • 20 June 2024 Planning permission refused
  • 19 December 2024 Appeal lodged
  • 30 July 2025 Planning permission granted
  • 30 July 2025 Appeal granted

None found. The register holds no published incident that names Earthcott Green Farm, Earthcott Green - Battery Energy Storage. If you know of one, report it (confidential reports are anonymised).

Has Earthcott Green Farm, Earthcott Green - Battery Energy Storage had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Earthcott Green Farm, Earthcott Green - Battery Energy Storage; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Earthcott Green Farm, Earthcott Green - Battery Energy Storage?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 19 August 2025.
Where is Earthcott Green Farm, Earthcott Green - Battery Energy Storage?
5 km south of Thornbury, Gloucestershire, United Kingdom (postcode BS35 3TD).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).