Battery storage · United Kingdom
Astwood Lane, Feckenham - Battery Storage
Operator Immersa Limited
Application Withdrawn200 MWData checked 16 November 2026Source record dated 8 May 2026
Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.
Astwood Lane, Feckenham - Battery Storage is a 200 MW battery storage site 6.3 km west of Studley, Worcestershire, United Kingdom. Its planning application (23/00417/FUL) went to Redditch on 31 March 2023 and was withdrawn on 6 June 2025. Its status in the Renewable Energy Planning Database (UK government) is application withdrawn. There are 27 other energy sites within 10 km, 10 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.
Get an email when Astwood Lane, Feckenham - Battery Storage changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, battery storage incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every battery storage incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The company behind this site
IMMERSA LIMITED (10124672), active, since 2016. 1 outstanding charge on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
The site
- Technology
- Battery storage (Stand-alone Storage)
- Capacity
- 200 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Application Withdrawn (Planning Application Withdrawn)
- Operator or applicant
- Immersa Limited
- Location
- Astwood Lane, Feckenham, Redditch, Worcestershire, B96 6HP, United Kingdom
- Planning authority
- Redditch
- Planning application
- 23/00417/FUL
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 23/00417/FUL, with what the planning evidence pack adds for this site.
Every application in Redditch · Alerts for applications and incidents near here
Timeline
- 31 March 2023 Planning application submitted
- 6 June 2025 Application withdrawn
Incidents on the register at this site
None found. The register holds no published incident that names Astwood Lane, Feckenham - Battery Storage. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Astwood Lane, Feckenham - Battery Storage had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Astwood Lane, Feckenham - Battery Storage; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Astwood Lane, Feckenham - Battery Storage?
- Application Withdrawn, in the Renewable Energy Planning Database (UK government), where it last changed on 8 May 2026.
- Where is Astwood Lane, Feckenham - Battery Storage?
- 6.3 km west of Studley, Worcestershire, United Kingdom (postcode B96 6HP).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).