Battery storage · United Kingdom

Wheaten Hill Farm - BESS

Operator Boom Power Limited

Application Submitted400 MWData checked 16 November 2026Source record dated 28 October 2025

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Wheaten Hill Farm - BESS is a 400 MW battery storage site 4.5 km south-west of Studley, Worcestershire, United Kingdom. Its planning application (25/00888/FUL) went to Redditch on 6 August 2025. Its status in the Renewable Energy Planning Database (UK government) is application submitted. There are 26 other energy sites within 10 km, 10 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

BOOM POWER LTD (12254340), active, since 2019. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Wheaten Hill Farm - BESS sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0058, Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire, 60 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire60 kmSignificant
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells111 kmSignificant
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool142 kmMajor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Capacity
400 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Submitted (Planning Application Submitted)
Operator or applicant
Boom Power Limited
Location
Wheaten Hill Farm, Salt Way, Feckenham, Redditch, Worcestershire, B96 6HH, United Kingdom
Planning authority
Redditch
Planning application
25/00888/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 25/00888/FUL, with what the planning evidence pack adds for this site.

Every application in Redditch · Alerts for applications and incidents near here

  • 6 August 2025 Planning application submitted

None found. The register holds no published incident that names Wheaten Hill Farm - BESS. If you know of one, report it (confidential reports are anonymised).

Has Wheaten Hill Farm - BESS had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Wheaten Hill Farm - BESS; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Wheaten Hill Farm - BESS?
Application Submitted, in the Renewable Energy Planning Database (UK government), where it last changed on 28 October 2025.
Where is Wheaten Hill Farm - BESS?
4.5 km south-west of Studley, Worcestershire, United Kingdom (postcode B96 6HH).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).