Onshore wind · United Kingdom
Dun Law Extension
Operator Renewable Energy Systems (RES)
Operational29.8 MWData checked 16 November 2026Source record dated 12 September 2013
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Dun Law Extension is a 29.8 MW wind farm 14 km south-east of Gorebridge, Borders, United Kingdom. Its planning application went to Scottish Borders on 27 April 2005 and was granted on 16 January 2006. It has been operating since 20 September 2009. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 20 other energy sites within 10 km, 17 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Dun Law Extension changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Onshore wind
- Capacity
- 29.8 MW (this record)
- All phases
- 47 MW, the phases on the register added up
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Renewable Energy Systems (RES)
- Location
- Dun Law (between Fala and Carfraemill 20 miles S-E of Edinburgh, Borders, United Kingdom
- Planning authority
- Scottish Borders
- First operating
- 2009
- Turbines
- 35
This record is 29.8 MW, one part of a site built in phases. With Dun Law (17.2 MW) the phases on the register add up to 47 MW. Dun Law
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page, with what the planning evidence pack adds for this site.
Every application in Scottish Borders · Alerts for applications and incidents near here
Timeline
- 27 April 2005 Planning application submitted
- 16 January 2006 Planning permission granted
- 1 May 2009 Construction started
- 20 September 2009 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Dun Law Extension. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Dun Law Extension had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Dun Law Extension; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Dun Law Extension?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 12 September 2013.
- Where is Dun Law Extension?
- 14 km south-east of Gorebridge, Borders, United Kingdom.
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).