← Back to Borders
Planning pack for this site, £295Other options

Onshore wind · United Kingdom

Ditcher Law Wind Farm

Operator E Power Ltd

Awaiting Construction52.8 MWData checked 16 November 2026Source record dated 22 June 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Ditcher Law Wind Farm is a 52.8 MW wind farm 16 km east of Gorebridge, Borders, United Kingdom. Its planning application (ECU00004890) went to Scottish Government (S36) on 8 August 2023 and was granted on 13 February 2026. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 18 other energy sites within 10 km, 14 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Ditcher Law Wind Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 49 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-0441, Wind turbine collapses at Aviva's Pitheavlis site in Perth, 77 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-04412025Wind turbine collapses at Aviva's Pitheavlis site in Perth77 kmSignificant
EIR-09112017Worker dies after fall from turbine at Whitelee windfarm near Glasgow92 kmMajor
EIR-10252018Worker dies after becoming stranded at Afton wind farm96 kmMajor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 46 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Onshore wind
Capacity
52.8 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
E Power Ltd
Location
N/S/E & W/O Vineleaf Cottage, Borders, TD2 6RD, United Kingdom
Planning authority
Scottish Government (S36)
Planning application
ECU00004890
Turbines
8, 200 m to tip

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for ECU00004890, with what the planning evidence pack adds for this site.

Every application in Scottish Government (S36) · Alerts for applications and incidents near here

  • 8 August 2023 Planning application submitted
  • 13 February 2026 Planning permission granted
  • 13 February 2031 Planning permission runs out

None found. The register holds no published incident that names Ditcher Law Wind Farm. If you know of one, report it (confidential reports are anonymised).

Has Ditcher Law Wind Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Ditcher Law Wind Farm; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Ditcher Law Wind Farm?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 22 June 2026.
Where is Ditcher Law Wind Farm?
16 km east of Gorebridge, Borders, United Kingdom (postcode TD2 6RD).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).