← Back to Lincolnshire
Planning pack for this site, £295Other options

Solar · United Kingdom

Dodds Wold Farm, Elsham - Solar Photovoltaic Panels

Operator Private Developer

Awaiting Construction0.2 MWData checked 16 November 2026Source record dated 19 August 2025

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Dodds Wold Farm, Elsham - Solar Photovoltaic Panels is a 0.2 MW solar farm 7.9 km north-east of Brigg, Lincolnshire, United Kingdom. Its planning application (PA/2025/754) went to North Lincolnshire on 19 June 2025 and was granted on 23 July 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 15 other energy sites within 10 km, 9 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

PRIVATE DEVELOPER NETWORK LIMITED (09386318), dissolved, since 2015. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Dodds Wold Farm, Elsham - Solar Photovoltaic Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1552, Fire starts in solar panels on commercial roof in Doncaster, 41 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15522023Fire starts in solar panels on commercial roof in Doncaster41 kmSignificant
EIR-11752026Rooftop solar panel fire guts NHS mental health ward in Malton64 kmSignificant
EIR-07642024Transformer smoking at solar farm in Burton Pedwardine71 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Private Developer
Location
Dodds Wold Farm, Elsham, Brigg, Lincolnshire, DN20 0NX, United Kingdom
Planning authority
North Lincolnshire
Planning application
PA/2025/754

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for PA/2025/754, with what the planning evidence pack adds for this site.

Every application in North Lincolnshire · Alerts for applications and incidents near here

  • 19 June 2025 Planning application submitted
  • 23 July 2025 Planning permission granted

None found. The register holds no published incident that names Dodds Wold Farm, Elsham - Solar Photovoltaic Panels. If you know of one, report it (confidential reports are anonymised).

Has Dodds Wold Farm, Elsham - Solar Photovoltaic Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Dodds Wold Farm, Elsham - Solar Photovoltaic Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Dodds Wold Farm, Elsham - Solar Photovoltaic Panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 19 August 2025.
Where is Dodds Wold Farm, Elsham - Solar Photovoltaic Panels?
7.9 km north-east of Brigg, Lincolnshire, United Kingdom (postcode DN20 0NX).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).