Planning pack for this site, £295Other options

Battery storage · Germany

Dittigheim BESS

Operator juwi Wind Germany 296 GmbH & Co. KG

Planned10 MWData checked 10 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Dittigheim BESS is a 10 MW battery storage site 3.7 km south of Tauberbischofsheim, Germany. It first operated in 2027. Its status in the Marktstammdatenregister (Bundesnetzagentur, Germany) is planned. There are 27 other energy sites within 10 km, 2 of them battery storage sites. The register holds no incident at this site. It holds 17 incidents at battery storage sites in Germany, and 196 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Dittigheim BESS sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 8 comparable battery incidents in Germany, grid-scale only, nearest first. The nearest is EIR-1586, Third battery fire at Suncycle site in Thuringia, 175 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15862024Third battery fire at Suncycle site in Thuringia175 kmSignificant
EIR-24372024Battery container fire causes EUR 700,000 damage at German test centre175 kmSignificant
EIR-24782026Battery storage unit fire releases gases in Obernzell, Germany309 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 5 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Usable capacity 28.3 MWh, Lithium-Batterie)
Capacity
10 MW
Capacity figure from
Marktstammdatenregister (Bundesnetzagentur, Germany)
Status
Planned (In planning)
Operator
juwi Wind Germany 296 GmbH & Co. KG
Location
Tauberbischofsheim, Main-Tauber-Kreis, Baden-Württemberg, 97941, Germany
First operating
2027

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names Dittigheim BESS. If you know of one, report it (confidential reports are anonymised).

Has Dittigheim BESS had a fire or other incident?
None is on the register as of 11 November 2026. The register holds no published incident that names Dittigheim BESS; it holds 17 incidents at battery storage sites in Germany.
What is the status of Dittigheim BESS?
Planned, in the Marktstammdatenregister (Bundesnetzagentur, Germany).
Where is Dittigheim BESS?
3.7 km south of Tauberbischofsheim, Germany (postcode 97941).

Source: Marktstammdatenregister, Bundesnetzagentur, Datenlizenz Deutschland, Namensnennung, Version 2.0 (www.govdata.de/dl-de/by-2-0). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).