Battery storage · Germany

Delling Mühlstr. 2 PV Carport Speicher

Operator TQ-Systems GmbH

Planned1 MWData checked 10 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Delling Mühlstr. 2 PV Carport Speicher is a 1 MW battery storage site on the edge of Weßling, Seefeld, Starnberg, Bayern, Germany. It first operated in 2026. Its status in the Marktstammdatenregister (Bundesnetzagentur, Germany) is planned. There are 16 other energy sites within 10 km, 4 of them battery storage sites. The register holds no incident at this site. It holds 17 incidents at battery storage sites in Germany, and 196 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Delling Mühlstr. 2 PV Carport Speicher sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 8 comparable battery incidents in Germany, grid-scale only, nearest first. The nearest is EIR-2478, Battery storage unit fire releases gases in Obernzell, Germany, 184 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-24782026Battery storage unit fire releases gases in Obernzell, Germany184 kmSignificant
EIR-15862024Third battery fire at Suncycle site in Thuringia317 kmSignificant
EIR-24372024Battery container fire causes EUR 700,000 damage at German test centre317 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 5 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Usable capacity 2.1 MWh, Lithium-Batterie)
Capacity
1 MW
Capacity figure from
Marktstammdatenregister (Bundesnetzagentur, Germany)
Status
Planned (In planning)
Operator
TQ-Systems GmbH
Location
Seefeld, Starnberg, Bayern, 82229, Germany
First operating
2026

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names Delling Mühlstr. 2 PV Carport Speicher. If you know of one, report it (confidential reports are anonymised).

Has Delling Mühlstr. 2 PV Carport Speicher had a fire or other incident?
None is on the register as of 11 November 2026. The register holds no published incident that names Delling Mühlstr. 2 PV Carport Speicher; it holds 17 incidents at battery storage sites in Germany.
What is the status of Delling Mühlstr. 2 PV Carport Speicher?
Planned, in the Marktstammdatenregister (Bundesnetzagentur, Germany).
Where is Delling Mühlstr. 2 PV Carport Speicher?
On the edge of Weßling, Seefeld, Starnberg, Bayern, Germany (postcode 82229).

Source: Marktstammdatenregister, Bundesnetzagentur, Datenlizenz Deutschland, Namensnennung, Version 2.0 (www.govdata.de/dl-de/by-2-0). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).