Solar · United Kingdom

Cullerlie Solar Farm

Operator Pennon Group · Owner Elgin Energy Holdings LTD

Operational15 MWData checked 16 November 2026Source record dated 29 September 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Cullerlie Solar Farm is a 15 MW solar farm 6.6 km south-west of Westhill, Aberdeenshire, United Kingdom. Its planning application (APP/2021/0378) went to Aberdeenshire on 22 February 2021 and was granted on 12 November 2021. It has been operating since 1 October 2025. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 6 other energy sites within 10 km, 2 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

212 energy sites within 40 km for Cullerlie Solar Farm

Members see the sites and incidents around this one, and every record behind them.

ELGIN ENERGY HOLDINGS LIMITED (07181686), active, since 2010. 2 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
15 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Pennon Group
Owner
Elgin Energy Holdings LTD
Location
Lands South Of Cornhill Farm Echt Westhill, Aberdeenshire, AB32 6XA, United Kingdom
Planning authority
Aberdeenshire
Planning application
APP/2021/0378
First operating
2025

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for APP/2021/0378, with what the planning evidence pack adds for this site.

Every application in Aberdeenshire · Alerts for applications and incidents near here

Status changed from Awaiting Construction to Operational on 16 November 2026.

  • 22 February 2021 Planning application submitted
  • 12 November 2021 Planning permission granted
  • 1 October 2025 Operational

None found. The register holds no published incident that names Cullerlie Solar Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Cullerlie Solar Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Cullerlie Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Cullerlie Solar Farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 16 November 2026.
Where is Cullerlie Solar Farm?
6.6 km south-west of Westhill, Aberdeenshire, United Kingdom (postcode AB32 6XA).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).