Solar · United Kingdom
Kintore - Solar Photovoltaic Array
Operator Mespil Solar Energy
Awaiting Construction50 MWData checked 16 November 2026Source record dated 18 September 2026
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Kintore - Solar Photovoltaic Array is a 50 MW solar farm 7.3 km north-west of Westhill, Aberdeenshire, United Kingdom. Its planning application (ECU00005245) went to Scottish Government (S36) on 29 July 2025 and was granted on 4 September 2026. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 26 other energy sites within 10 km, 10 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Kintore - Solar Photovoltaic Array changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
The company behind this site
MESPIL SOLAR ENERGY LIMITED (14739372), active, since 2023. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Kintore - Solar Photovoltaic Array sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1476, House fire reported to have started on solar panels in Carnoustie, 81 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1476 | 2026 | House fire reported to have started on solar panels in Carnoustie | 81 km | Significant |
| EIR-1238 | 2019 | Leak from solar heating system at Carnegie Leisure Centre Dunfermline | 143 km | Minor |
| EIR-2016 | 2022 | Solar panel fire evacuates Hawick High School | 200 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 50 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Mespil Solar Energy
- Location
- 2km S/O Kintore, Inverurie, Aberdeenshire, AB51 0XH, United Kingdom
- Planning authority
- Scottish Government (S36)
- Planning application
- ECU00005245
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for ECU00005245, with what the planning evidence pack adds for this site.
Every application in Scottish Government (S36) · Alerts for applications and incidents near here
Status changed from Application Submitted to Awaiting Construction on 16 November 2026.
Timeline
- 29 July 2025 Planning application submitted
- 4 September 2026 Planning permission granted
- 4 September 2029 Planning permission runs out
Incidents on the register at this site
None found. The register holds no published incident that names Kintore - Solar Photovoltaic Array. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Kintore - Solar Photovoltaic Array had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Kintore - Solar Photovoltaic Array; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Kintore - Solar Photovoltaic Array?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 16 November 2026.
- Where is Kintore - Solar Photovoltaic Array?
- 7.3 km north-west of Westhill, Aberdeenshire, United Kingdom (postcode AB51 0XH).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).