Cressing Solar Farm (Phase 2)

Operator Octopus Investments · Owner Octopus Capital Limited

Abandoned18 MWData checked 16 November 2026Source record dated 21 August 2018

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Cressing Solar Farm (Phase 2) is a 18 MW solar farm 5.3 km north-west of Witham, Essex, United Kingdom. Its planning application (15/00949/FUL) went to Braintree on 24 July 2015 and was granted on 12 November 2015. Its status in the Renewable Energy Planning Database (UK government) is abandoned. There are 45 other energy sites within 10 km, 25 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 3 other sites and 382 energy sites within 40 km for Cressing Solar Farm (Phase 2)

Members see the sites and incidents around this one, and every record behind them.

OCTOPUS INVESTMENTS LIMITED (03942880), active, since 2000. 100 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
18 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Abandoned
Operator or applicant
Octopus Investments
Owner
Octopus Capital Limited
Location
Land South Of Sheepcote Wood B, Witham Road, Cressing, Braintree, Essex, Essex, CM77 8NZ, United Kingdom
Planning authority
Braintree
Planning application
15/00949/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 15/00949/FUL, with what the planning evidence pack adds for this site.

Every application in Braintree · Alerts for applications and incidents near here

  • 24 July 2015 Planning application submitted
  • 12 November 2015 Planning permission granted
  • 12 November 2018 Planning permission expired

None found. The register holds no published incident that names Cressing Solar Farm (Phase 2). If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Cressing Solar Farm (Phase 2) had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Cressing Solar Farm (Phase 2); it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Cressing Solar Farm (Phase 2)?
Abandoned, in the Renewable Energy Planning Database (UK government), where it last changed on 21 August 2018.
Where is Cressing Solar Farm (Phase 2)?
5.3 km north-west of Witham, Essex, United Kingdom (postcode CM77 8NZ).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).