Battery storage · United Kingdom

Periwinkle Hall - Links Solar photovoltaic farm & Battery storage

Operator Low Carbon Limited · Owner Low Carbon Holdco Limited

OperationalData checked 16 November 2026Source record dated 30 October 2024

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Periwinkle Hall - Links Solar photovoltaic farm & Battery storage is a battery storage site 5.1 km east of Braintree, Essex, United Kingdom. Its planning application (21/01878/FUL) went to Braintree on 9 June 2021 and was granted on 23 December 2021. It has been operating since 1 October 2024. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 42 other energy sites within 10 km, 15 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

The operator's 22 other sites and 384 energy sites within 40 km for Periwinkle Hall - Links Solar photovoltaic farm & Battery…

Members see the sites and incidents around this one, and every record behind them.

LOW CARBON LIMITED (13356797), active, since 2021. 1 outstanding charge on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Battery storage (Co-located with RE)
Status
Operational
Operator or applicant
Low Carbon Limited
Owner
Low Carbon Holdco Limited
Location
E/O Periwinkle Hall, Links Road, Perry Green, Bradwell, Braintree, Essex, CM77 8ES, United Kingdom
Planning authority
Braintree
Planning application
21/01878/FUL
First operating
2024

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 21/01878/FUL, with what the planning evidence pack adds for this site.

Every application in Braintree · Alerts for applications and incidents near here

  • 9 June 2021 Planning application submitted
  • 23 December 2021 Planning permission granted
  • 1 December 2023 Construction started
  • 1 October 2024 Operational

None found. The register holds no published incident that names Periwinkle Hall - Links Solar photovoltaic farm & Battery storage. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Periwinkle Hall - Links Solar photovoltaic farm & Battery storage had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Periwinkle Hall - Links Solar photovoltaic farm & Battery storage; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Periwinkle Hall - Links Solar photovoltaic farm & Battery storage?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 30 October 2024.
Where is Periwinkle Hall - Links Solar photovoltaic farm & Battery storage?
5.1 km east of Braintree, Essex, United Kingdom (postcode CM77 8ES).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).