Data centre · United States

CoreWeave Chester VA

Owner CoreWeave

Operational82 MWData checked 10 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

CoreWeave Chester VA is a 82 MW data centre, United States. Its status in the Epoch AI, AI data centers is operational. The register holds no incident at this site. It holds 49 incidents at data centres in the United States, and 181 worldwide.

Everything on this page

Members see the sites and incidents around this one, and every record behind them.

Technology
Data centre (AI campus, power estimated by Epoch AI)
Capacity
82 MW
Capacity figure from
Epoch AI, AI data centers
Status
Operational (Buildings 3 is estimated complete by the end of Q1 2027, based on the current...)
Owner
CoreWeave
Location
1401 Meadowville Technology Parkway, Chester, VA, United States

None found. The register holds no published incident that names CoreWeave Chester VA. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has CoreWeave Chester VA had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names CoreWeave Chester VA; it holds 49 incidents at data centres in the United States.
What is the status of CoreWeave Chester VA?
Operational, in the Epoch AI, AI data centers.
Where is CoreWeave Chester VA?
United States.

Source: Epoch AI, AI data centers (epoch.ai/data/ai-data-centers), licensed under CC BY 4.0. Power is Epoch AI's estimate. The dataset. The register adds only the incidents and the counts.