Solar · Brazil
Colibri solar farm
Planned (permitted)644 MWChecked 8 October 2026Last changed in the dataset 11 June 2025
Colibri solar farm is a 644 MW solar farm 8.9 km east of Mansidão, Região Geográfica Intermediária de Barreiras, Bahia, Brazil. Its status in the Global Energy Monitor solar and wind trackers is planned (permitted). No other energy site in the register's datasets is within 10 km. The register holds no incident at this site. It holds 5 incidents at solar farms in Brazil, and 359 worldwide.
Get the next one by email
Free alerts on solar PV incidents in Brazil, and an email when Colibri solar farm is updated. No account needed; unsubscribe in one click.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
By signing up you agree to the privacy policy.
Preview of the planning evidence pack for this site
No comparable incidents are recorded near this site yet.
The register holds no solar incident to set against this site today. A pack would still set out the incidents within 50 km of any kind, sites of a similar size worldwide and the guidance consultees cite.
Order the pack for this site. Launch price: £145 until 31 October (normally £295). By email in minutes.
The site
- Technology
- Solar
- Capacity
- 644 MW
- Status
- Planned (permitted) (Pre-construction)
- Location
- Mansidão, Região Geográfica Intermediária de Barreiras, Bahia, Brazil
- Phases in the tracker
- 13
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
Incidents on the register at this site
None found. The register holds no published incident that names Colibri solar farm. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Colibri solar farm had a fire or other incident?
- None is on the register as of 12 October 2026. The register holds no published incident that names Colibri solar farm; it holds 5 incidents at solar farms in Brazil.
- What is the status of Colibri solar farm?
- Planned (permitted), in the Global Energy Monitor solar and wind trackers, where it last changed on 11 June 2025.
- Where is Colibri solar farm?
- 8.9 km east of Mansidão, Região Geográfica Intermediária de Barreiras, Bahia, Brazil.
Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).