← Back to Lancashire

Onshore wind · United Kingdom

Coal Clough Wind Farm Repowering

Operator Coal Clough Wind Farm

Operational16 MWData checked 16 November 2026Source record dated 18 May 2015

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Coal Clough Wind Farm Repowering is a 16 MW wind farm 5.3 km north-west of Todmorden, Lancashire, United Kingdom. Its planning application (APP/2009/0758) went to Burnley on 22 December 2009 and was granted on 21 January 2013. It has been operating since 1 May 2015. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 30 other energy sites within 10 km, 18 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

613 energy sites within 40 km for Coal Clough Wind Farm Repowering

Members see the sites and incidents around this one, and every record behind them.

Technology
Onshore wind
Capacity
16 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Coal Clough Wind Farm
Location
Coal Clough Wind Farm,The Long Causeway, Burnley, Lancashire, United Kingdom
Planning authority
Burnley
Planning application
APP/2009/0758
First operating
2015
Turbines
8

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for APP/2009/0758, with what the planning evidence pack adds for this site.

Every application in Burnley · Alerts for applications and incidents near here

  • 22 December 2009 Planning application submitted
  • 21 January 2013 Planning permission granted
  • 14 May 2014 Construction started
  • 1 May 2015 Operational

None found. The register holds no published incident that names Coal Clough Wind Farm Repowering. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Coal Clough Wind Farm Repowering had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Coal Clough Wind Farm Repowering; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Coal Clough Wind Farm Repowering?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 18 May 2015.
Where is Coal Clough Wind Farm Repowering?
5.3 km north-west of Todmorden, Lancashire, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).