Clearwell Farm - solar

Operator Heritage Energy

Operational2 MWData checked 16 November 2026Source record dated 23 September 2016

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Clearwell Farm - solar is a 2 MW solar farm 5.2 km south of Risca, Gwent, United Kingdom. Its planning application (11/0339) went to Newport on 7 April 2011 and was granted on 20 May 2011. It has been operating since 15 December 2015. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 73 other energy sites within 10 km, 30 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

493 energy sites within 40 km for Clearwell Farm - solar

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Heritage Energy
Location
Pentre-poeth Road, Cardiff, Gwent, United Kingdom
Planning authority
Newport
Planning application
11/0339
First operating
2015

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 11/0339, with what the planning evidence pack adds for this site.

Every application in Newport · Alerts for applications and incidents near here

  • 7 April 2011 Planning application submitted
  • 20 May 2011 Planning permission granted
  • 1 September 2014 Construction started
  • 15 December 2015 Operational

None found. The register holds no published incident that names Clearwell Farm - solar. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Clearwell Farm - solar had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Clearwell Farm - solar; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Clearwell Farm - solar?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 23 September 2016.
Where is Clearwell Farm - solar?
5.2 km south of Risca, Gwent, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).