← Back to Cornwall

Solar · United Kingdom

Clann Solar Farm

Operator Lightsource Renewable Energy · Owner Lightsource Holdings 3 Limited

Operational1.4 MWData checked 16 November 2026Source record dated 14 May 2015

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Clann Solar Farm is a 1.4 MW solar farm 5.1 km south-west of Bodmin, Cornwall, United Kingdom. Its planning application (PA12/02871) went to Cornwall on 23 March 2012 and was granted on 5 October 2012. It has been operating since 4 November 2014. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 43 other energy sites within 10 km, 23 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 178 other sites and 219 energy sites within 40 km for Clann Solar Farm

Members see the sites and incidents around this one, and every record behind them.

LIGHTSOURCE RENEWABLE ENERGY LIMITED (08946381), active, since 2014. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
1.4 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Lightsource Renewable Energy
Owner
Lightsource Holdings 3 Limited
Location
Clann Farm, Clan Lane, Lanivet, Bodmin, Cornwall, Cornwall, PL30 5HD, United Kingdom
Planning authority
Cornwall
Planning application
PA12/02871
Appeal reference
APP/D0840/W/15/3002662
First operating
2014

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for PA12/02871, with what the planning evidence pack adds for this site.

Every application in Cornwall · Alerts for applications and incidents near here

  • 23 March 2012 Planning application submitted
  • 5 October 2012 Planning permission granted
  • 25 July 2014 Construction started
  • 4 November 2014 Operational
  • 10 February 2015 Appeal lodged

None found. The register holds no published incident that names Clann Solar Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Clann Solar Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Clann Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Clann Solar Farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 14 May 2015.
Where is Clann Solar Farm?
5.1 km south-west of Bodmin, Cornwall, United Kingdom (postcode PL30 5HD).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).