Onshore wind · United Kingdom
Clach Liath Wind Farm
Operator Falck Renewables Wind Ltd
Application Refused42.5 MWData checked 16 November 2026Source record dated 26 February 2013
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Clach Liath Wind Farm is a 42.5 MW wind farm 9.3 km north-west of Dingwall, Highland, United Kingdom. Its planning application (12/01689/FUL) went to Highland on 30 April 2012 and was refused on 13 February 2013. Its status in the Renewable Energy Planning Database (UK government) is application refused. There are 12 other energy sites within 10 km, 10 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Clach Liath Wind Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Onshore wind
- Capacity
- 42.5 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Application Refused (Planning Permission Refused)
- Operator or applicant
- Falck Renewables Wind Ltd
- Location
- Land To The East Of Meall Na Speireig Clach Liath Evanton Ross-shire, Highland, United Kingdom
- Planning authority
- Highland
- Planning application
- 12/01689/FUL
- Turbines
- 17
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 12/01689/FUL, with what the planning evidence pack adds for this site.
Every application in Highland · Alerts for applications and incidents near here
Timeline
- 30 April 2012 Planning application submitted
- 13 February 2013 Planning permission refused
Incidents on the register at this site
None found. The register holds no published incident that names Clach Liath Wind Farm. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Clach Liath Wind Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Clach Liath Wind Farm; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Clach Liath Wind Farm?
- Application Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 26 February 2013.
- Where is Clach Liath Wind Farm?
- 9.3 km north-west of Dingwall, Highland, United Kingdom.
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).