Planning pack for this site, £295Other options

Battery storage · United Kingdom

Chillington Estate, Chillington Park - Battery Storage

Operator Elgin Energy Esco Limited

Awaiting Construction40 MWData checked 16 November 2026Source record dated 16 February 2026

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Chillington Estate, Chillington Park - Battery Storage is a 40 MW battery storage site 3.2 km north of Codsall, West Midlands, United Kingdom. Its planning application (23/00576/FULM) went to South Staffordshire on 17 November 2023 and was granted on 25 July 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 57 other energy sites within 10 km, 23 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Chillington Estate, Chillington Park - Battery Storage sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0584, Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells, 89 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells89 kmSignificant
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool95 kmMajor
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire107 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Co-located with RE)
Capacity
40 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Elgin Energy Esco Limited
Location
Chillington Estate Chillington Park Chillington, West Midlands, WV8 1RE, United Kingdom
Planning authority
South Staffordshire
Planning application
23/00576/FULM

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 23/00576/FULM, with what the planning evidence pack adds for this site.

Every application in South Staffordshire · Alerts for applications and incidents near here

  • 17 November 2023 Planning application submitted
  • 25 July 2025 Planning permission granted
  • 25 July 2028 Planning permission runs out

None found. The register holds no published incident that names Chillington Estate, Chillington Park - Battery Storage. If you know of one, report it (confidential reports are anonymised).

Has Chillington Estate, Chillington Park - Battery Storage had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Chillington Estate, Chillington Park - Battery Storage; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Chillington Estate, Chillington Park - Battery Storage?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 16 February 2026.
Where is Chillington Estate, Chillington Park - Battery Storage?
3.2 km north of Codsall, West Midlands, United Kingdom (postcode WV8 1RE).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).