Solar · Spain

Castile-La Mancha solar project XCVII

Operational6.4 MWChecked 8 October 2026Last changed in the dataset 8 May 2025

Castile-La Mancha solar project XCVII is a 6.4 MW solar farm 29 km north of La Carolina, Castilla-La Mancha, Spain. It first operated in 2023. Its status in the Global Energy Monitor solar and wind trackers is operational. There is one other energy site within 10 km. The register holds no incident at this site. It holds 7 incidents at solar farms in Spain, and 359 worldwide.

Technology
Solar
Capacity
6.4 MW
Status
Operational (Operating)
Location
Castilla-La Mancha, Spain
First operating
2023

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names Castile-La Mancha solar project XCVII. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Castile-La Mancha solar project XCVII had a fire or other incident?
None is on the register as of 13 October 2026. The register holds no published incident that names Castile-La Mancha solar project XCVII; it holds 7 incidents at solar farms in Spain.
What is the status of Castile-La Mancha solar project XCVII?
Operational, in the Global Energy Monitor solar and wind trackers, where it last changed on 8 May 2025.
Where is Castile-La Mancha solar project XCVII?
29 km north of La Carolina, Castilla-La Mancha, Spain.

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).