Solar · Spain

Campos 259 solar farm

Planned (permitted)259 MWChecked 8 October 2026Last changed in the dataset 5 March 2025

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Campos 259 solar farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Technology
Solar
Capacity
259 MW
Status
Planned (permitted) (Pre-construction)
Operator
Gestiona Energías Renovables
Location
Campos del Río, Murcia, Región de Murcia, Spain

View on OpenStreetMap (the tracker marks the position as approximate). The larger dot is this site; the others are sites within 40 km.

None found. The register holds no published incident that names Campos 259 solar farm. If you know of one, report it (confidential reports are anonymised).

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts.