Planning pack for this site, £295Other options

Onshore wind · United Kingdom

Camas Nan Gall, Toberonochy - Wind Turbine

Operator Cadzow Brothers

Awaiting ConstructionData checked 16 November 2026Source record dated 7 October 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Camas Nan Gall, Toberonochy - Wind Turbine is a wind farm 25 km south-west of Oban, Argyll and Bute, United Kingdom. Its planning application (26/00624/PP) went to Argyll and Bute on 3 July 2026 and was granted on 1 September 2026. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There is one other energy site within 10 km. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Camas Nan Gall, Toberonochy - Wind Turbine sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 49 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-1951, Investigation begins after turbine fire at Ardrossan wind farm, 83 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-19512022Investigation begins after turbine fire at Ardrossan wind farm83 kmSignificant
EIR-11572026Fire destroys turbine at Whitelee windfarm near Glasgow96 kmSignificant
EIR-09112017Worker dies after fall from turbine at Whitelee windfarm near Glasgow101 kmMajor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 46 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Onshore wind
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Cadzow Brothers
Location
East Of Camas Nan Gall, Toberonochy, Isle Of Luing, Argyll and Bute, PA34 4TZ, United Kingdom
Planning authority
Argyll and Bute
Planning application
26/00624/PP
Turbines
1, 45 m to tip

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 26/00624/PP, with what the planning evidence pack adds for this site.

Every application in Argyll and Bute · Alerts for applications and incidents near here

  • 3 July 2026 Planning application submitted
  • 1 September 2026 Planning permission granted
  • 1 September 2029 Planning permission runs out

None found. The register holds no published incident that names Camas Nan Gall, Toberonochy - Wind Turbine. If you know of one, report it (confidential reports are anonymised).

Has Camas Nan Gall, Toberonochy - Wind Turbine had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Camas Nan Gall, Toberonochy - Wind Turbine; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Camas Nan Gall, Toberonochy - Wind Turbine?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 7 October 2026.
Where is Camas Nan Gall, Toberonochy - Wind Turbine?
25 km south-west of Oban, Argyll and Bute, United Kingdom (postcode PA34 4TZ).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).