Solar · United Kingdom
Bypass Nurseries Solar Farm
Operator Sun Spirit
Operational3.3 MWData checked 16 November 2026Source record dated 5 August 2014
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Bypass Nurseries Solar Farm is a 3.3 MW solar farm on the edge of Evesham, Hereford and Worcester, United Kingdom. Its planning application (12/02700) went to Wychavon on 10 December 2012 and was granted on 2 April 2013. It has been operating since 28 July 2014. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 26 other energy sites within 10 km, 21 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Bypass Nurseries Solar Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Solar
- Capacity
- 3.3 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Sun Spirit
- Location
- Bypass Nursery, The Bungalow, Evesham WR11 8UB, Hereford and Worcester, United Kingdom
- Planning authority
- Wychavon
- Planning application
- 12/02700
- First operating
- 2014
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 12/02700, with what the planning evidence pack adds for this site.
Every application in Wychavon · Alerts for applications and incidents near here
Timeline
- 10 December 2012 Planning application submitted
- 2 April 2013 Planning permission granted
- 28 July 2014 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Bypass Nurseries Solar Farm. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Bypass Nurseries Solar Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Bypass Nurseries Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Bypass Nurseries Solar Farm?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 5 August 2014.
- Where is Bypass Nurseries Solar Farm?
- On the edge of Evesham, Hereford and Worcester, United Kingdom.
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).