Planning pack for this site, £295Other options

Solar · United Kingdom

R Sinclair Transport Limited, Enterprise Way - Solar Panels

Operator R Sinclair Transport

Awaiting Construction0.2 MWData checked 16 November 2026Source record dated 26 January 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

R Sinclair Transport Limited, Enterprise Way - Solar Panels is a 0.2 MW solar farm on the edge of Evesham, Worcestershire, United Kingdom. Its planning application (W/25/02463/GPJ) went to Wychavon on 11 December 2025 and was granted on 22 December 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 20 other energy sites within 10 km, 17 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for R Sinclair Transport Limited, Enterprise Way - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-2523, Suspected solar panel fault sparks roof fire at Ombersley home, 30 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-25232020Suspected solar panel fault sparks roof fire at Ombersley home30 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire40 kmSignificant
EIR-21092015Solar installer falls through fragile farm roof at Kemble, suffering brain injuries45 kmMajor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
R Sinclair Transport
Location
R Sinclair Transport Limited, Enterprise Way, Vale Park, Evesham, Worcestershire, WR11 1AD, United Kingdom
Planning authority
Wychavon
Planning application
W/25/02463/GPJ

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for W/25/02463/GPJ, with what the planning evidence pack adds for this site.

Every application in Wychavon · Alerts for applications and incidents near here

  • 11 December 2025 Planning application submitted
  • 22 December 2025 Planning permission granted
  • 22 December 2028 Planning permission runs out

None found. The register holds no published incident that names R Sinclair Transport Limited, Enterprise Way - Solar Panels. If you know of one, report it (confidential reports are anonymised).

Has R Sinclair Transport Limited, Enterprise Way - Solar Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names R Sinclair Transport Limited, Enterprise Way - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of R Sinclair Transport Limited, Enterprise Way - Solar Panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 26 January 2026.
Where is R Sinclair Transport Limited, Enterprise Way - Solar Panels?
On the edge of Evesham, Worcestershire, United Kingdom (postcode WR11 1AD).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).