← Back to Wiltshire
Planning pack for this site, £295Other options

Solar · United Kingdom

Byde Mill Solar Farm, Poulshot - Solar Farm

Operator Ampyr · Owner Ase UK Holdings Limited

Awaiting Construction13.5 MWData checked 16 November 2026Source record dated 26 January 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Byde Mill Solar Farm, Poulshot - Solar Farm is a 13.5 MW solar farm 4.7 km south-west of Devizes, Wiltshire, United Kingdom. Its planning application (PL/2024/11631) went to Wiltshire on 27 January 2025 and was granted on 22 December 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 25 other energy sites within 10 km, 17 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

ASE UK HOLDINGS LIMITED (13412982), active, since 2021. 5 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Byde Mill Solar Farm, Poulshot - Solar Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1524, Fire at a solar PV equipped house in Stoney Stratton, 36 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15242025Fire at a solar PV equipped house in Stoney Stratton36 kmSignificant
EIR-20652021Loft fire believed caused by a solar panel at Paintworks flats in Bristol38 kmMinor
EIR-21092015Solar installer falls through fragile farm roof at Kemble, suffering brain injuries38 kmMajor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
13.5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Ampyr
Owner
Ase UK Holdings Limited
Location
Townsend Farm, Townsend, Poulshot, Devizes, Wiltshire, SN10 1SD, United Kingdom
Planning authority
Wiltshire
Planning application
PL/2024/11631

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for PL/2024/11631, with what the planning evidence pack adds for this site.

Every application in Wiltshire · Alerts for applications and incidents near here

  • 22 December 2017 Planning permission expired
  • 27 January 2025 Planning application submitted
  • 22 December 2025 Planning permission granted

None found. The register holds no published incident that names Byde Mill Solar Farm, Poulshot - Solar Farm. If you know of one, report it (confidential reports are anonymised).

Has Byde Mill Solar Farm, Poulshot - Solar Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Byde Mill Solar Farm, Poulshot - Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Byde Mill Solar Farm, Poulshot - Solar Farm?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 26 January 2026.
Where is Byde Mill Solar Farm, Poulshot - Solar Farm?
4.7 km south-west of Devizes, Wiltshire, United Kingdom (postcode SN10 1SD).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).